Mystiek in project-based construction Cothen and Langbroek
For these 4 houses in Cothen and Langbroek, the ‘perfect’ path was walked from design to execution. The architect consulted with Solinso 2 years in advance and detailed information was mutually agreed upon. Even after transfer to the contractor there were regular work consultations.
This resulted in 2 units of semi-detached houses with a perfect finish with a quiet appearance and a high yield. Executed by Bouwbedrijf Osnabrugge from Scherpenzeel.
Project Specifications
Solar Roof Tile
Mystiek-1567
Total installation
3,8 kWp each home
Design
42 panels east and west (4 homes)
Roof Tile
Wienerberger Actua 10EB